Incident Reports
BCFD
Truck Company 15
May Incident Reports
5/11/10 Box Alarm T15-13 133hrs A shift
515 N. Washington Street
E6 E51 E31 E33 E41 T1 T5 BC2 BC1 M6 W/F E23 E5 T15 AF2 EMS3 2nd alarm E2 SQ11 E13 E46 T16 T6 R1
Units had a two story occupied middle of the group dwelling, heavy fire 1st and 2nd floors in the rear with extension to both sides. The dwelling was full of trash and debris, which hampered operations. Fire under control at 1414 Hours
5/10/10 Box Alarm 51-6 1127hrs A shift
16 S. Highland Avenue
E51 E41 SQ11 E6 E50 T3 T15 BC1 BC2 M16 W/F E2 T20 AF2 EMS5 CAR3
Units had a two story brick occupied dwelling, with fire on the exterior porch, with some extension to the interior of the dwelling
5/9/10 Box Alarm 33-12 1841hrs B shift Code F
1623 E. Lafayette Avenue
E31 E33 E6 E51 E5 E13 T5 T15 BC2 BC4 M16 W/F T1 AF2 EMS3 SO2 Box414
Two story brick, middle of the group, with heavy fire on the 1st floor. After the fire was knocked down, a civilian was located and pronounced at the scene. Units remained out several hours for extensive overhaul
5/8/10 Box Alarm T15-7 2216hrs B shift
2117 E. Chase Street
E6 E51 E31 E33 E41 E13 T15 T1 BC2 BC1 M10 W/F E27 T5 AF2 EMS3 SO2 CAR3
T15 arrives to find a 2 story brick, occupied dwelling, with the 1st floor fully involved. E6 was at the home early in the night for a electrical fire in the panel. Power was disconnected by BGE but the homeowners returned later that night using candles for lighting. This was the apparent cause of the fire
5/7/10 Box Alarm T15-14 1155hrs B shift 3 alarms
718 N Collington Avenue
E6 E51 E5 E33 E41 T3 T1 BC2 BC1 M41 2nd alarm E2 SQ11 E26 E8 T15 T16 R1 AF2 EMS3 CAR3 SO2
3rd alarm E13 E27 E55 E14 T6 T10 WT1 M7 MCU Bcems
T15 arrives to find heavy smoke coming from the rear Fire of a 2 story brick dwelling. After gaing entry it was discovered that their was heavy fire in the rear of 4 dwellings with extension to the 2nd floor of 2 dwellings. At one point evacuation tones were sounded and the fire was fought from the outside
5/6/10 Box Alarm 41-8 2241hrs C shift 2 alarms
600 S. Highland Avenue
E5 E51 SQ11 E50 E6 T3 T20 BC1 BC2 M20 2nd alarm E41 E2 E23 E33 T15 T1 WT1 R1 EMS5 BC6
Units were confronted with a 3 story condo, including rooftop deck, fully involved. The 2nd Alarm was pulled upon the arrival of BC1. Units remainded on scene several hours overhauling and chasing hot spots. Placed under control at 0023 Hrs
5/3/10 Box alarm T15-3 0042 hrs D shift
1901 Perlman Place
T15 arrived on scene of a 2 story brick middle of the group with fire showing. Units had a vacant dwelling all searches proved negative.
Monthly Incident Reports